It only took three days for me to finally find time to get up to Betty's so we could work on our project. The plan was to do it on Sunday. Ended up giving Mike a ride instead and that made me late to Home Depot. Yup, they were closed. Monday Dave's surgery and recovery took longer than I planned. And then I lost my babysitter.
So finally I managed to get to Home Depot to get my slats/poles bought. And the stars aligned with Dave coming home and a babysitter being available. I feel like such a flake though. I usually am very good about being where I am suppose to be when I am suppose to be there. Not two days late.
So we got the fabric all cut out and stitched together. We only have the hemming and adding the Velcro left. At least I think that is all we have left. Then I have to sand the slats and drill the hole for the tie. Wish I would have taken my camera up to document part of it. Maybe I will remember at our next work on it time.
No comments:
Post a Comment